Project Description

Taking care not to disturb the recently rebuilt England National Stadium “Wembley”, we installed new, all weather, artificial 5-a-side football pitches.

The pitches are installed to Power Leagues’ specification. The central administration and clubhouse is a modular building installed on a pad foundation.

As the principal contractor our works covered all civil engineering, services installation, football pitches plus the ordering and installation of the modular building.

Typical time from breaking ground to handover, 5 months.

Project Details

Client:Power League
Location:Wembley, London